Parcitank supplies two isothermal stainless steel flour silos to Radar Process
A new project that consolidates a partnership based on trust, quality and experience.
At Parcitank we know that trust is not imposed: it is earned day by day, project by project. Proof of this is our latest collaboration with Radar Process, a benchmark company in engineering solutions for industrial processes, which has once again placed its trust in our technical capacity and experience for the development of a new storage system.
The project consisted of the design, manufacture and supply of two isothermal silos for flour storage, with a capacity of 110 m³ each. Both have been built entirely in stainless steel, thus guaranteeing maximum durability, hygiene and resistance to corrosion in an environment with high food safety requirements.
This delivery not only meets the highest quality standards, but also reflects our strong and long-standing relationship with Radar Process, with whom we share a common vision: to deliver innovative and reliable solutions that drive performance and efficiency for our customers.
We are deeply grateful for the trust placed in Parcitank once again. We continue to move forward together, committed to excellence and a job well done.

Other news
-
Parcitank will be closed for the Christmas holidays from 22 December to 6 January.
19/12/2025
-
Parcitank once again participates in the charity initiative ‘El Árbol de los Sueños’ (The Tree of Dreams) organised by the ‘la Caixa’ Foundation.
18/12/2025
-
Parcitank receives a visit from the Castile-La Mancha Institute for Foreign Promotion (IPEX)
16/12/2025
-
Lifting a 24-metre industrial tank: engineering, precision and safety |PARCITANK, S.A.|
15/12/2025
-
Commitment, Innovation and Quality: the values that define PARCITANK, S.A.
11/12/2025